| № |
 |
Site N2 characteristics |
| 1 |
|
The site outlook (industrial areas, plot of land) |
|
Land plot, Gnilusha village |
| 2 |
|
Planned purpose (industrial enterprise, housing construction, trade and service buildings, agricultural production etc.) |
|
Cattle-breeding complex construction |
| 3 |
|
Owner (general information, property rights) |
|
Ertil municipal district |
| 4 |
|
The site features (for plots of land - hectares) (for premises – area (м2), brief description of premises) |
|
Area is 100000 sq. m |
| 5 |
|
Engineering infrastructure (present at the site or at a distance) |
|
|
Gas (m3/hour, pressure, diameter) |
|
Gas pipeline planned for 2009 |
|
|
Water (m3/hour, average depth of underground water) |
|
Rozhnovsky Tower |
|
|
Electric energy (kW) |
|
Transformer substation within 100 m range |
|
|
Sewage (m3/hour) |
|
missing |
|
|
Treatment facilities (m3/hour) |
|
missing |
| 6 |
|
Transport infrastructure (hard-surface road at the site or at a distance, incoming rail-line, railroad, railway station) |
|
Local paved road; 32 km away from a railway station. |
| 7 |
|
The site purchase options (lease, purchase) |
|
Lease, purchase |