| ¹ |
 |
Site N1 characteristics |
| 1 |
|
The site outlook (industrial areas, plot of land) |
|
Land plot |
| 2 |
|
Planned purpose (industrial enterprise, housing construction, trade and service buildings, agricultural production etc.) |
|
Building structures to process agricultural products, for industrial use |
| 3 |
|
Owner (general information, property rights) |
|
Municipal property owned by Bobrov municipal district |
| 4 |
|
The site features (for plots of land - hectares) (for premises – area (ì2), brief description of premises) |
|
490 hectares |
| 5 |
|
Engineering infrastructure (present at the site or at a distance) |
|
|
Gas (m3/hour, pressure, diameter) |
|
Bobrov gas distribution station |
|
|
Water (m3/hour, average depth of underground water) |
|
Town facilities and own water intake structures, depth of underground waters 90-110 m |
|
|
Electric energy (kW) |
|
Electric substation 110/35/10 kW |
|
|
Sewage (m3/hour) |
|
- |
|
|
Treatment facilities (m3/hour) |
|
- |
| 6 |
|
Transport infrastructure (hard-surface road at the site or at a distance, incoming rail-line, railroad, railway station) |
|
Road MDon – Bobrov – Talovaya – Novohopersk borders the site at the north. The road is the third technical category, 9 meters wide. Distance to the federal MFDon road is 11 km. Distance to the railroad between Liky and Povorino and to Bitiug railway station is 1 km. |
| 7 |
|
The site purchase options (lease, purchase) |
|
Long-termed lease with consequent possession transfer (selling) |